We have finally gotten to the point where the major "destruction" of the house is over with and we're on to seeing progress and finalizing some rooms. We've decided that we're going to get our major living spaces livable and as completed as possible and move in. That means our formal living room and dining room will be closed off and completed after we move in... a.k.a. Hank comes home and works in the evenings, etc. Our downstairs bathrooms will be fully completed, the master bedroom, little man's bedroom, the kitchen, breakfast room, and as much of the hallway as possible. Our third bedroom downstairs will basically be a furniture storage room for now and we'll get around to that "whenever". Last weekend was finally time to work on Grady's room...
This is what it looked like before........
This is what it looked like before........
We've pulled off all the crown moulding so it can be stripped of paint and we've also stripped all the doorways and baseboards in the room. They've been sanded and primed now. As we were getting ready to prime the walls, we noticed we needed to spackle the nail holes... no big deal, right?.... seriously.... were they used as a dart board? I'm still finding some that we missed...
I'm so excited to get his room painted and make it a "Little Boy Room"!!
No comments:
Post a Comment